Monday, 3 June 2013
Sunday, 2 June 2013
Frame start 13/3/13
Imagine our surprise to see the framing starting the day after the slab was poured! These guys really fly once they start. It's exciting to see the actual sizes of rooms and layout after months of looking at plans!
Monday, 22 April 2013
Pool installed 22/2/13
We were very excited to see the pool go in! We chose Narellan Pools and couldn't have been happier with them. Excellent communication and efficiency! The hole was dug and the pool shell put in on the same day. Having the pool put in before the house has saved money on craning fees and avoided lots of mess later. The pool was then plumbed and filled with water. Next the concrete beam was poured and the hard cover put in place. Once the house is completed Narellan will return to install the solar, connect the plumbing and power and clean up the pool to use. The water should look almost translucent blue - not the green untreated tap water colour above!
Monday, 25 March 2013
Demolition
Plans
We decided to customise a Metropol floor plan to suit our needs. Essentially we liked the Metropol base but we were keen to have storage under the stairs, the laundry off the hallway and a kitchen island bench with access around both sides. Whilst we liked the floating stairs on the standard floor plan, it meant that our rooms upstairs were very narrow down one side. As it is now, we have plenty of under stair storage which will be very handy. We were not keen at all on accessing the laundry via the pantry. We have kept an area in front of the laundry sliding cupboards where the ironing board or clotheshorse can be set up and added a heating vent to assist drying. The biggest change was the kitchen layout where we set back the external wall to allow access straight through to the pantry and to keep a good length island bench. Also wanted to keep the island free of a sink. Fridge location was important as we didn't want kids to have go into the pantry to access the fridge. We are however putting a bar fridge in the pantry. We made a continuous wall of base cupboards extending into the pantry for a clean look. We added big windows for the kitchen, pantry, laundry and family room for plenty of natural light.
Upstairs we changed everything! We were set on having the master at the rear for a view over the backyard and pool so that dictated everything else. We also preferred to have 2 big bedrooms for kids with WIR's and built in desks rather than 3 small ones. We are planning to put a sofa bed in the study for those occasional guest stays. Let's just say that we didn't want to look at the views on our south side boundary so put the bathrooms down that side. Again lots of big windows added.
The house is sited as per Bayside regulations meaning we have a 3 metre offset down each side boundary. In hindsight we wished we had known that we could have applied for dispensation and moved the house closer to our south boundary. We did get dispensations for front setback and garage wall height. We are having 9 ft ceilings downstairs and 8' 6" upstairs.